HTML has links - PDF has Authentication
296-200A-111  <<  296-200A-112 >>   296-200A-300

PDFWAC 296-200A-112

Who is liable when a city, town, or county fails to verify a contractor's registration?

The city, county, or town that issues a building permit without verifying the contractor's registration may be liable for a maximum penalty amount of ten thousand dollars. See RCW 18.27.110(1).
[Statutory Authority: RCW 18.27.040, 18.27.070, 18.27.075, 18.27.125, 2001 c 159, and chapter 18.27 RCW. WSR 03-20-097, § 296-200A-112, filed 9/30/03, effective 11/17/03. Statutory Authority: Chapter 18.27 RCW. WSR 97-24-071, § 296-200A-112, filed 12/2/97, effective 1/5/98.]
Site Contents
Selected content listed in alphabetical order under each group