Appendix F—Selection of protective systems.
The following figures are a graphic summary of the requirements contained in Part N for excavations 20 feet or less in depth. Protective systems for use in excavations more than 20 feet in depth must be designed by a registered professional engineer in accordance with WAC
296-155-657 (2) and (3).
|
FIGURE N-27 - PRELIMINARY DECISIONS |
|
FIGURE N-28 - SLOPING OPTIONS |
|
FIGURE N-29 - SHORING AND SHIELDING OPTIONS |