PDFWAC 173-18-046
Conflicts between designations and criteria.
In the event that any of the designations set forth in this chapter or a shoreline master program approved under WAC 173-18-044, conflict with the criteria set forth in RCW 90.58.030(2) or in WAC 173-18-040 the criteria shall control. The designation of the stream or river shall be governed by the criteria, except that the local government must amend the local master program to reflect the new designation within three years of the discovery of the discrepancy.
[Statutory Authority: RCW 90.58.030 (3)(e), 90.58.045, 90.58.065, 90.58.140(9), 90.58.143, 90.58.147, 90.58.200, 90.58.355, 90.58.390, 90.58.515, 43.21K.080, 71.09.250, 71.09.342, 77.55.181, 89.08.460, chapters 70.105D, 80.50 RCW. WSR 07-02-086 (Order 05-12), § 173-18-046, filed 1/2/07, effective 2/2/07. Statutory Authority: RCW 90.58.120 and 90.58.200. WSR 80-08-052 (Order DE 80-20), § 173-18-046, filed 6/30/80.]