HTML has links - PDF has Authentication

Chapter 463-60 WAC

Last Update: 11/23/15

APPLICATIONS FOR SITE CERTIFICATION

WAC Sections

SUBPART A—GENERAL
HTMLPDF463-60-010Purpose.
HTMLPDF463-60-012General—Organization—Index.
HTMLPDF463-60-015General—Description of applicant.
HTMLPDF463-60-021Council recognizes pressing need for energy facilities.
HTMLPDF463-60-025General—Designation of agent.
HTMLPDF463-60-035General—Application review costs and funding.
HTMLPDF463-60-045General—Where filed.
HTMLPDF463-60-055General—Form and number of copies.
HTMLPDF463-60-065General—Full disclosure by applicants.
HTMLPDF463-60-075General—Assurances.
HTMLPDF463-60-085General—Mitigation measures.
HTMLPDF463-60-095General—Sources of information.
HTMLPDF463-60-101General—Consultation.
HTMLPDF463-60-105General—Graphic material.
HTMLPDF463-60-115General—Specific contents and applicability.
HTMLPDF463-60-116General—Amendments to applications, additional studies, procedure.
HTMLPDF463-60-117General—Applications for expedited processing.
SUBPART B—PROPOSAL
HTMLPDF463-60-125Proposal—Site description.
HTMLPDF463-60-135Proposal—Legal descriptions and ownership interests.
HTMLPDF463-60-145Proposal—Construction on site.
HTMLPDF463-60-155Proposal—Energy transmission systems.
HTMLPDF463-60-160Proposal—Electrical transmission facilities.
HTMLPDF463-60-165Proposal—Water supply.
HTMLPDF463-60-175Proposal—System of heat dissipation.
HTMLPDF463-60-185Proposal—Characteristics of aquatic discharge systems.
HTMLPDF463-60-195Proposal—Wastewater treatment.
HTMLPDF463-60-205Proposal—Spillage prevention and control.
HTMLPDF463-60-215Proposal—Surface-water runoff.
HTMLPDF463-60-225Proposal—Emission control.
HTMLPDF463-60-230Proposal—Carbon dioxide mitigation.
HTMLPDF463-60-232Proposal—Greenhouse gases emissions performance standards.
HTMLPDF463-60-235Proposal—Construction and operation activities.
HTMLPDF463-60-245Proposal—Construction management.
HTMLPDF463-60-255Proposal—Construction methodology.
HTMLPDF463-60-265Proposal—Protection from natural hazards.
HTMLPDF463-60-275Proposal—Security concerns.
HTMLPDF463-60-285Proposal—Study schedules.
HTMLPDF463-60-295Proposal—Potential for future activities at site.
HTMLPDF463-60-296Proposal—Analysis of alternatives.
HTMLPDF463-60-297Proposal—Pertinent federal, state and local requirements.
SUBPART C—NATURAL ENVIRONMENT
HTMLPDF463-60-302Natural environment—Earth.
HTMLPDF463-60-312Natural environment—Air.
HTMLPDF463-60-322Natural environment—Water.
HTMLPDF463-60-332Natural environment—Habitat, vegetation, fish and wildlife.
HTMLPDF463-60-333Natural environment—Wetlands.
HTMLPDF463-60-342Natural environment—Energy and natural resources.
SUBPART D—BUILT ENVIRONMENT
HTMLPDF463-60-352Built environment—Environmental health.
HTMLPDF463-60-362Built environment—Land and shoreline use.
HTMLPDF463-60-372Built environment—Transportation.
HTMLPDF463-60-535Socioeconomic impact.
SUBPART E—APPLICATIONS FOR PERMITS AND AUTHORIZATIONS
HTMLPDF463-60-536Air emissions permits and authorizations.
HTMLPDF463-60-537Wastewater/stormwater discharge permit applications.
HTMLPDF463-60-540Other permit applications.
Site Contents
Selected content listed in alphabetical order under each group