HTML has links - PDF has Authentication

Chapter 173-240 WAC

|Show DispositionsLast Update: 7/11/00

SUBMISSION OF PLANS AND REPORTS FOR CONSTRUCTION OF WASTEWATER FACILITIES

WAC Sections

HTMLPDF173-240-010Purpose and scope.
HTMLPDF173-240-020Definitions.
DOMESTIC WASTEWATER FACILITIES
HTMLPDF173-240-030Submission of plans and reports.
HTMLPDF173-240-035Restrictions—Subsurface disposal systems.
HTMLPDF173-240-040Review standards.
HTMLPDF173-240-050General sewer plan.
HTMLPDF173-240-060Engineering report.
HTMLPDF173-240-070Plans and specifications.
HTMLPDF173-240-075Construction quality assurance plan.
HTMLPDF173-240-080Operation and maintenance manual.
HTMLPDF173-240-090Declaration of construction completion.
HTMLPDF173-240-095Form—Declaration of construction of water pollution control facilities.
HTMLPDF173-240-100Requirement for certified operator.
HTMLPDF173-240-104Ownership and operation and maintenance.
INDUSTRIAL WASTEWATER FACILITIES
HTMLPDF173-240-110Submission of plans and reports.
HTMLPDF173-240-120Review standards.
HTMLPDF173-240-130Engineering report.
HTMLPDF173-240-140Plans and specifications.
HTMLPDF173-240-150Operation and maintenance manual.
DOMESTIC AND INDUSTRIAL WASTEWATER FACILITIES
HTMLPDF173-240-160Requirement for professional engineer.
HTMLPDF173-240-170Right of inspection.
HTMLPDF173-240-180Approval of construction changes.