These documents are currently being revised to incorporate the changes made during the 2024 Legislative Session. Please consult the Sections Affected Table for changes made during the 2024 Legislative Session.
Cedar river spawning channel—Mitigation of water diversion projects.
Should the requirements of RCW
77.100.100 through
77.100.160 not be met, the department shall seek immediate legal clarification of the steps which must be taken to fully mitigate water diversion projects on the Cedar river.
NOTES:
Effective date—1993 sp.s. c 2 §§ 1-6, 8-59, and 61-79: See RCW
43.300.900.
Project designation—Legislative finding—Severability—1989 c 85: See notes following RCW
77.100.100.