Construction by county forces project records.
All construction by county forces project cost records shall be kept in the manner prescribed by the BARS manual. Records of quantities shall be kept in a manner consistent with original project estimates. The project records shall contain, but shall not be limited to, the following:
(1) Dated authorizing resolution;
(2) Vicinity map showing project location and limits;
(3) County engineer's estimate;
(4) Affidavit of preconstruction publication required by RCW
36.77.070;
(5) Documentation of start and end of construction dates;
(6) Affidavit of post-construction publication showing true and complete project cost as required by RCW
36.77.070.
[Statutory Authority: Chapter
36.78 RCW. WSR 09-23-044, § 136-18-060, filed 11/9/09, effective 12/10/09. Statutory Authority: Chapter
36.79 RCW. WSR 99-01-021, § 136-18-060, filed 12/7/98, effective 1/7/99. Statutory Authority: RCW
36.78.070 and
36.79.060. WSR 96-17-013, § 136-18-060, filed 8/12/96, effective 9/12/96. Statutory Authority: Chapter
36.78 RCW. WSR 79-01-098 (Order 35), § 136-18-060, filed 1/3/79; Order 27, § 136-18-060, filed 1/27/76.]