HTML has links - PDF has Authentication
480-110-433  <<  480-110-435 >>   480-110-445

PDFWAC 480-110-435

Extension contracts.

(1) Each water company must file, as a part of its tariff, an extension rule that states the conditions required by the company before it will extend its transmission and distribution infrastructure to provide water service to an applicant.
(2) Companies entering into any extension contract must:
(a) File the contract with the commission not less than thirty days before the proposed effective date of the contract.
(b) Conform the proposed contract to the applicable provisions of WAC 480-80-143 (Special contracts for gas, electric, and water companies).
(3) Extension contracts must include the documentation necessary to show that the proposed charges are fair, just, reasonable, and sufficient.
(4) An extension may also be referred to as a distribution extension, a main extension, or a line extension.
[Statutory Authority: RCW 80.01.040, 80.04.160, 81.04.160, and 34.05.353. WSR 03-22-046 (Docket No. A-030832, General Order No. R-509), § 480-110-435, filed 10/29/03, effective 11/29/03. Statutory Authority: RCW 80.01.040. WSR 99-24-100 (Order R-467, Docket No. UW-980082), § 480-110-435, filed 11/30/99, effective 12/31/99.]