HTML has links - PDF has Authentication
246-282-060  <<  246-282-070 >>   246-282-080

PDFWAC 246-282-070

Construction and maintenance.

(1) All owners and persons in charge of shellfish operations must arrange their physical facilities to aid in the flow of shellfish products through all handling, processing, and storage areas in a manner that will minimize contamination of the shellfish.
(2) Any owner of a shellfish operation must submit to the department for consultation properly prepared plans and specifications of physical facilities for shellfish processing or sanitation activities at least thirty days before the facilities are:
(a) Originally constructed;
(b) Converted from another use; or
(c) Extensively remodeled to the extent that a plan for a building permit is required by the city or county where located.
(3) The department will review properly prepared plans and specifications of physical facilities for shellfish processing or sanitation activities required by subsection (2) of this section within thirty days of receipt and provide technical assistance to the owner of the shellfish operation regarding whether the proposed physical facilities would meet the requirements of this chapter.
[Statutory Authority: RCW 69.30.030 and 43.20.030. WSR 01-04-054, § 246-282-070, filed 2/5/01, effective 3/8/01. Statutory Authority: RCW 43.20.050. WSR 91-02-051 (Order 124B), recodified as § 246-282-070, filed 12/27/90, effective 1/31/91. Statutory Authority: RCW 69.30.030. WSR 78-08-059 (Order 163), § 248-58-060, filed 7/24/78; Regulation 58.060, effective 3/11/60.]