Search

Chapter 480-75 WAC

Last Update: 12/23/08

Hazardous liquid pipelines — safety

WAC Sections

GENERAL RULES
480-75-100 Definitions.
480-75-200 Application of rules -- Responsibility for contractors.
480-75-210 Additional requirements.
480-75-220 Severability.
480-75-240 Annual pipeline safety fee methodology.
480-75-250 Civil penalty for violation of chapter 81.88 RCW.
480-75-260 Exemption for rules in chapter 480-75 WAC.
480-75-270 Damage prevention.
DESIGN
480-75-300 Leak detection.
480-75-310 Geological considerations.
480-75-320 Overpressure protection.
480-75-330 Overfill protection.
480-75-340 Cathodic protection test station location.
480-75-350 Design specifications for new pipeline.
480-75-360 Class locations.
480-75-370 Design factor (F) for steel pipe.
480-75-380 Location of pump stations and breakout tanks for pipelines.
480-75-390 Valve spacing and rapid shutdown.
CONSTRUCTION AND REPAIRS
480-75-400 Backfill and bed requirements.
480-75-410 Coatings.
480-75-420 Hydrostatic test requirements.
480-75-430 Welding procedures.
480-75-440 Pipeline repairs.
480-75-450 Construction specifications.
480-75-460 Welding inspection requirements.
OPERATION AND MAINTENANCE
480-75-500 Moving and lowering hazardous liquid pipelines.
480-75-510 Remedial action for corrosion deficiencies.
480-75-520 Inspections during excavation.
480-75-530 Right of way inspections.
480-75-540 Pipeline markers and above ground facilities.
480-75-550 Change in class location.
REPORTING
480-75-600 Maps, drawings, and records of hazardous liquid facilities.
480-75-610 Reporting requirements for proposed construction.
480-75-620 Pressure testing reporting requirements.
480-75-630 Incident reporting.
480-75-640 Depth-of-cover survey.
480-75-650 Annual reports.
480-75-660 Procedural manual for operations, maintenance, and emergencies.
480-75-999 Adoption by reference.