Last Update: 10/8/13

Chapter 222-30 WAC

TIMBER HARVESTING

WAC Sections

Policy—Timber harvesting.
*Harvest unit planning and design.
*Western Washington riparian management zones.
*Eastern Washington riparian management zones.
Riparian management zones for exempt 20-acre parcels.
Even-aged harvest—Size and timing.
Stream bank integrity.
Shade requirements to maintain water temperature.
Salvage logging within riparian management zones.
Felling and bucking.
Cable yarding.
*Large woody debris removal or repositioning.
Helicopter yarding.
Ground-based logging systems.
Landing cleanup.
Postharvest site preparation.
Slash disposal or prescribed burning.
Timber harvesting on islands.
Rate of harvest monitoring.
Reviser's note: For an explanation of the rules marked with an asterisk (*), see WAC 222-12-010.
Site Contents
Selected content listed in alphabetical order under each group