Search

Chapter 296-150T WAC

Last Update: 7/17/12

FACTORY-BUILT TEMPORARY WORKER HOUSING STRUCTURES

WAC Sections

296-150T-0010 Authority, purpose, and scope.
296-150T-0020 What definitions apply to this chapter?
296-150T-0030 How is this chapter enforced?
296-150T-0040 Will you keep my manufacturing information confidential?
296-150T-0050 Can you prohibit the installation of factory-built temporary worker housing structures?
296-150T-0070 Do you have reciprocal agreements with other states to inspect factory-built temporary worker housing structures?
296-150T-0080 Do you allow a local enforcement agency to inspect factory-built temporary worker housing at the manufacturing location?
296-150T-0100 What happens if I disagree with your decision regarding my compliance with this chapter?
296-150T-0110 Do you have an advisory board to address factory-built temporary worker housing structure issues?
296-150T-0120 Where can I obtain technical assistance regarding factory-built temporary worker housing structures?
296-150T-0130 How do I register a complaint?
296-150T-0140 Do you allow the use of alternate materials, alternate design and method of construction?
INSIGNIA
296-150T-0200 Who must purchase factory-built temporary worker housing insignia?
296-150T-0210 What are the insignia requirements?
296-150T-0220 How do I obtain insignia information and the required forms?
296-150T-0230 What are the insignia application requirements?
296-150T-0250 How do I replace lost or damaged insignia?
DESIGN PLAN
296-150T-0300 When is design plan approval required?
DESIGN-PLAN APPROVAL
296-150T-0320 What must I provide with my request for design-plan approval by the department?
296-150T-0340 What must an engineering analysis for design plans include?
296-150T-0350 What must the test procedures and results for design plans include?
296-150T-0380 What happens if you approve my design plan?
296-150T-0390 If my design plan is not approved, how much time do I have to submit a corrected design plan?
296-150T-0400 What happens after my design plan is approved?
296-150T-0410 When does my design plan expire?
296-150T-0495 Contractor deposit accounts.
INSPECTIONS PRIOR TO ISSUANCE OF AN INSIGNIA
296-150T-0500 When is an inspection required?
296-150T-0510 How do I request an inspection?
296-150T-0520 What happens if my factory-built temporary worker housing structure passes inspection?
296-150T-0530 Am I charged if I request an inspection but I am not prepared?
296-150T-0540 Who inspects factory-built temporary worker housing structures for installation at the temporary worker housing site?
296-150T-0550 Do you notify the department of health after your final inspection of factory-built structures at a manufacturing location?
USED FACTORY-BUILT STRUCTURES WITHOUT AN INSIGNIA
296-150T-0580 Must I obtain an insignia for used factory-built structures?
296-150T-0590 How do I obtain insignia for used factory-built structures?
CODES FOR FACTORY-BUILT TEMPORARY WORKER HOUSING
296-150T-0600 What manufacturing codes apply to factory-built temporary worker housing?
MANUFACTURER'S NOTICE TO THE DEPARTMENT
296-150T-0700 Must manufacturers of factory-built temporary worker housing structures notify you if they manufacture at more than one location?
296-150T-0710 Must manufacturers of factory-built temporary worker housing structures notify you of a change in business name or address?
296-150T-0720 Must manufacturers of factory-built temporary worker housing structures notify you of a change in business ownership?
FACTORY-BUILT TEMPORARY WORKER HOUSING FEES
296-150T-3000 Factory-built temporary worker housing fees.