These documents are currently being revised to incorporate the changes made during the 2024 Legislative Session. Please consult the Sections Affected Table for changes made during the 2024 Legislative Session.

43.21C.0384  <<  43.21C.039 >>   43.21C.040

Metals mining and milling operationsEnvironmental impact statements required.

Notwithstanding any provision in RCW 43.21C.030 and 43.21C.031 to the contrary, an environmental impact statement shall be prepared for any proposed metals mining and milling operation as required by RCW 78.56.050.

NOTES:

Effective date1994 c 232 §§ 1-5, 9-17, and 23-31: See RCW 78.56.901.
Disclosures required with SEPA checklist, metals mining and milling operations: RCW 78.56.040.
Site Contents
Selected content listed in alphabetical order under each group