HTML has links - PDF has Authentication
Beginning of Chapter  <<  226-16-010 >>   226-16-020

PDFWAC 226-16-010

Methods of construction.

All construction by a public entity using board funds shall be done by advertisement, competitive bid and contract, except:
(1) Utility and railroad relocations and adjustments; and
(2) Installation of traffic control devices.
If federal funds are included in the project, the negotiated contract shall include the applicable provisions of federal highway administration policies and procedures prescribed in 23 C.F.R. 140, 23 C.F.R. 645 and 23 C.F.R. 646, Federal Aid Policy Guide.
[Statutory Authority: Chapter 47.06A RCW. WSR 99-18-048, ยง 226-16-010, filed 8/27/99, effective 9/27/99.]
Site Contents
Selected content listed in alphabetical order under each group