HTML has links - PDF has Authentication
16-324-391  <<  16-324-392 >>   16-324-393

PDFWAC 16-324-392

Isolation requirements.

(1) All field locations for nuclear and generation 1 production must have prior approval from the department.
(2) Generation 2 through generation 5 must be isolated by at least three hundred fifty feet from all noncertified potatoes.
(3) When ring rot is found in a field planted with more than one lot of seed potatoes, the department will reject the entire field.
[Statutory Authority: RCW 15.14.015 and chapter 34.05 RCW. WSR 13-12-014, § 16-324-392, filed 5/24/13, effective 6/24/13. Statutory Authority: Chapters 15.14 and 34.05 RCW. WSR 07-11-010, § 16-324-392, filed 5/3/07, effective 6/3/07. Statutory Authority: Chapter 15.14 RCW. WSR 00-20-070, § 16-324-392, filed 10/3/00, effective 11/3/00. Statutory Authority: RCW 15.14.030. WSR 97-11-028, § 16-324-392, filed 5/14/97, effective 6/14/97.]
Site Contents
Selected content listed in alphabetical order under each group