Make sure suspended scaffolds and scaffold components meet these strength requirements.

(1) You must meet the following strength requirements:
(a) Suspended scaffolds must support, without failure, the total of their own weight plus four times the maximum intended load;
(b) Suspended scaffold components must meet the requirements contained in Table 4, Suspended Scaffold Strength Requirements.
(2) Surfaces that support scaffold support devices must withstand four times the rated load of the hoist.
Note:
Scaffold support devices include outrigger beams, cornice hooks, parapet clamps, and similar devices.
Table 4
Suspended Scaffold Strength Requirements
These scaffold components:
Must meet these strength requirements:
Adjustable scaffold
Suspension ropes, including connecting hardware
Support six times the rated load of the hoist.
Adjustable scaffold
Direct connections to roofs and floors
Counterweights used to balance the scaffold
Resist four times the tipping moment with the scaffold operating at the rated load of the hoist.
Nonadjustable scaffold
Suspension ropes, including connecting hardware
Support six times the maximum intended load applied or transmitted to the rope.
All other scaffold components
Support its own weight plus four times the maximum intended load.