Permit—Duration—Material modification of ride or structure—Bungee jumping device replacement, movement, purchase.
(1) Except as provided in subsection (2) of this section or unless a shorter period is specified by the department, permits issued under RCW 67.42.030 are valid for a one-year period.
(2) If an amusement ride or structure is materially rebuilt or materially modified so as to change the original action of the amusement ride or structure, the amusement ride or structure shall be subject to a new inspection under RCW 67.42.020 and the owner or operator shall apply for a new permit under RCW 67.42.030.
(3) If an amusement ride or structure for which a permit has been issued pursuant to RCW 67.42.030 is moved and installed in another place but is not materially rebuilt or materially modified so as to change the original action of the amusement ride or structure, no new permit is required prior to the expiration of the permit.
(4) A bungee jumping device or a part of a device, including, but not limited to, the crane, person lift basket, mobile crane, balloon or balloon basket, anchor or anchor attachment structure, or landing device, that is replaced shall be reinspected by an insurer, a person with whom the insurer has contracted, or by a person authorized by the department to inspect bungee jumping devices, and the owner or operator of the device shall apply for a new permit under RCW 67.42.030.
(5) A bungee jumping operator shall have any bungee jumping device or structure that is moved and installed in another location reinspected by an insurer, a person with whom the insurer has contracted, or a person authorized by the department to inspect bungee jumping devices before beginning operation.
(6) Any new operator who purchases an existing bungee jumping device or structure must have the bungee jumping device inspected and permitted as required under RCW 67.42.020 before beginning operation.
NOTES:
Findings—Intent—1993 c 203: See note following RCW 67.42.010.