The Legislature website will be intermittently unavailable from 7AM to 7PM, Saturday, October 24 for scheduled maintenance. We apologize for the inconvenience.

60.24.040  <<  60.24.070 >>   60.24.075

PDF

RCW 60.24.070

Period covered by stumpage lien.

The person granting the privilege mentioned in RCW 60.24.035 is only entitled to the lien as provided therein for saw logs, spars, piles and other timber cut during the eight months next preceding the filing of the claim, as herein provided in RCW 60.24.075.
[ 1893 c 132 s 6; RRS s 1167. Prior: Code 1881 s 1946; 1877 p 217 s 8.]