HTML has links - PDF has Authentication
357-31-275  <<  357-31-280 >>   357-31-285

PDFWAC 357-31-280

How long can operations be suspended?

The period of suspended operations must not exceed fifteen calendar days without director approval.
[Statutory Authority: Chapter 41.06 RCW. WSR 05-08-137, ยง 357-31-280, filed 4/6/05, effective 7/1/05.]
Site Contents
Selected content listed in alphabetical order under each group