HTML has links - PDF has Authentication
200-230-090  <<  200-230-100 >>   End of Chapter

PDFWAC 200-230-100

Approval process for minor works on state capitol grounds.

Proposing entities must submit a proposal to the director for placement of a minor work on state capitol grounds. The proposal shall include:
(1) A description of the work;
(2) An explanation of why the proposing entity believes it fits the definition of a minor work;
(3) A description of how the proposal meets the criteria in WAC 236-18-030 and the requirements of WAC 236-18-040, and considers and responds to the applicable guidelines under WAC 236-18-060 and 236-18-070.
The director will confirm that a proposed work is a "minor work" based on the definition provided in this rule, and may grant approval or request additional information. Review or approval by the capitol campus design advisory committee, the Washington state arts commission and the state capitol committee is not required; however, the director may seek their advice at his or her discretion.
The department will work with the proposing entity on design and siting considerations.
[Statutory Authority: 2011 c 43. WSR 11-23-093, recodified as § 200-230-100, filed 11/17/11, effective 11/17/11. Statutory Authority: Chapter 43.34, 43.19 RCW and 1997 c 149 § 140(3). WSR 98-01-112, § 236-18-100, filed 12/18/97, effective 1/18/98.]
Site Contents
Selected content listed in alphabetical order under each group