HTML has links - PDF has Authentication
173-175-260  <<  173-175-270 >>   173-175-350

PDFWAC 173-175-270

Department review response time.

In reviewing the various documents required in the construction permit process, the department shall respond in a timely manner to the owner or project engineer with written review comments, approval, or acceptance as appropriate.
If the department response is anticipated to occur sixty days or more beyond the date of receipt of the document(s), the department shall notify the owner and/or project engineer in writing and advise them of the expected response date.
[Statutory Authority: RCW 43.21A.064, [43.21A.]080 and 86.16.061. WSR 92-12-055 (Order 91-17), ยง 173-175-270, filed 6/1/92, effective 7/2/92.]
Site Contents
Selected content listed in alphabetical order under each group