HTML has links - PDF has Authentication
16-302-080  <<  16-302-085 >>   16-302-086

PDFWAC 16-302-085

Withdrawing a field from inspection for seed certification.

The applicant applying for seed certification may withdraw a field from field inspection for seed certification by notifying the certifying agency before the field is inspected.
[Statutory Authority: RCW 15.49.005, 15.49.081, 15.49.310, 15.49.370(3), and chapter 34.05 RCW. WSR 14-20-050, § 16-302-085, filed 9/25/14, effective 10/26/14. Statutory Authority: RCW 15.49.005, 15.49.081, 15.49.310, 15.49.370(3) and chapter 17.24 RCW. WSR 00-24-077, § 16-302-085, filed 12/4/00, effective 1/4/01.]
Site Contents
Selected content listed in alphabetical order under each group