HTML has links - PDF has Authentication
132F-325-020  <<  132F-325-030 >>   132F-325-040

PDFWAC 132F-325-030

Threshold determination.

(1) The responsible official shall make a "threshold determination" (a decision whether or not an environmental impact statement is required) following procedures contained in WAC 197-10-300 through 197-10-340.
(2) An environmental checklist is required to be completed in the determination process except for exemptions noted in WAC 197-10-170, 197-10-175 and 197-10-180, or when it is predetermined an environmental statement is required.
[Order 31, ยง 132F-325-030, filed 9/20/76.]
Site Contents
Selected content listed in alphabetical order under each group