Search
296-67-029  <<  296-67-033 >>   296-67-037

WAC 296-67-033

No agency filings affecting this section since 2003

Prestartup safety review.

  (1) The employer shall perform a prestartup safety review for new facilities and for modified facilities when the modification is significant enough to require a change in the process safety information.

     (2) The prestartup safety review shall confirm that prior to the introduction of highly hazardous chemicals to a process:

     (a) Construction and equipment is in accordance with design specifications;

     (b) Safety, operating, maintenance, and emergency procedures are in place and are adequate;

     (c) For new facilities, a process hazard analysis has been performed and recommendations have been resolved or implemented before startup; and modified facilities meet the requirements contained in management of change, WAC 296-67-045.

     (d) Training of each employee involved in operating a process has been completed.



[Statutory Authority: Chapter 49.17 RCW. 92-17-022 (Order 92-06), § 296-67-033, filed 8/10/92, effective 9/10/92.]