To print a page in the WAC, use your browser’s normal print functions (Ctrl-P on a PC, Command-P on a Mac, or File > Print on either). The resulting printed page will show just the content and not the banner at the top, the left-side navigation, or the footer links. To see how the page will look before you print it, use your browser’s Print Preview.

296-127-023  <<  296-127-025 >>   296-127-026

Applicability of joint federal-state standards.

(1) When a public works project is subject to the provisions of the Washington state public works law, chapter 39.12 RCW, and the Federal Davis-Bacon and related acts, the contractor and every subcontractor on that project must pay at least the Washington state prevailing wage rates, if they are higher than the federal prevailing wage rates for the project unless specifically preempted by federal law.
(2) When the federal prevailing wage rates are higher than the Washington state prevailing wage rates, the contractor shall pay the federal rate as required by federal law.
[Statutory Authority: Chapters 39.04 and 39.12 RCW and RCW 43.22.270. WSR 92-01-104, § 296-127-025, filed 12/18/91, effective 1/31/92; WSR 88-22-046 (Order 88-22), § 296-127-025, filed 10/31/88.]