Search

Chapter 246-359 WAC

Last Update: 1/18/99

Temporary worker housing construction standard

WAC Sections

246-359-001 Purpose and scope.
246-359-005 Applicability.
246-359-010 Definitions.
246-359-020 Powers and duties of the department of health.
246-359-030 Cooperation with the department of health -- Right of entry.
246-359-040 Appeals.
246-359-050 Minor variances to the temporary worker housing construction standard.
246-359-060 Architect or engineer of record and plan submittal responsibilities.
246-359-070 Application and construction documents required for plan review.
246-359-080 Plan review approval and expiration of plan approval.
246-359-090 Issuing and maintaining a construction permit.
246-359-100 Expiration and extension of construction permits.
246-359-110 Construction without a permit.
246-359-120 Required inspections.
246-359-130 Stop work orders.
246-359-140 Certificate of completion.
246-359-150 Site requirements.
246-359-160 Temporary worker housing minimum floor area and ceiling height.
246-359-170 Wood framed construction and concrete masonry unit (CMU) general limitations.
246-359-180 Concrete footings and foundations for wood framed construction.
246-359-200 Wood framed construction.
246-359-210 Treated wood foundations for wood framed construction.
246-359-220 Floor framing for wood framed construction.
246-359-230 Wall framing for wood framed construction.
246-359-240 Exterior wall covering for wood framed construction.
246-359-250 Roof framing for wood framed construction and concrete masonry units (CMU).
246-359-300 Ceiling framing for wood framed construction and concrete masonry units (CMU).
246-359-310 Roof sheathing for wood framed construction and concrete masonry units.
246-359-320 Roof covering materials for wood framed construction and concrete masonry units (CMU).
246-359-330 Roof framing ventilation for wood framed construction and concrete masonry units (CMU).
246-359-340 Nailing schedule wood framed construction and concrete masonry units.
246-359-350 Roof connections for concrete masonry units (CMU).
246-359-400 Concrete masonry unit (CMU).
246-359-405 Concrete masonry units (CMU) materials.
246-359-410 Foundations and footings for concrete masonry units (CMU) walls.
246-359-420 Placing of concrete masonry units (CMU).
246-359-430 Floors for concrete masonry units (CMU).
246-359-440 Walls of concrete masonry units (CMU).
246-359-500 Window construction requirements.
246-359-510 Door requirements.
246-359-520 Door landings, stairways and guardrails.
246-359-530 Interior finishes.
246-359-540 Lighting and electrical.
246-359-550 Smoke detectors.
246-359-560 Plumbing.
246-359-565 Cooking facilities.
246-359-570 Mechanical installations.
246-359-575 Energy and ventilation and indoor air quality requirement exemptions.
246-359-580 Heating and insulation.
246-359-590 Liquid petroleum gas (LP-gas) storage tanks.
246-359-600 Alternate construction.
246-359-700 Approval of factory assembled structures (FAS).
246-359-710 Installation of factory assembled structures (FAS) -- Except for manufactured homes.
246-359-720 Installation requirements for manufactured homes.
246-359-730 Manufactured home installers.
246-359-740 Drain connector to factory assembled structures (FAS).
246-359-750 Water connector to factory assembled structures (FAS).
246-359-760 Gas connections to factory assembled structures (FAS).
246-359-800 WISHA requirements affecting building temporary worker housing.
246-359-990 Fees.