WAC
220-110-050 through
220-110-225 set forth technical provisions that shall apply to freshwater hydraulic projects. Certain technical provisions shall be required depending upon the individual proposal and site specific characteristics. Additional special provisions may be included as necessary to address site-specific conditions. Those provisions, where applicable, shall be contained in the hydraulic project approval, as necessary to protect fish life. Saltwater provisions referenced in WAC
220-110-230 through
220-110-330 may be applied to tidally influenced areas upstream of river mouths and the mainstem Columbia River downstream of Bonneville Dam, where applicable.
[Statutory Authority: RCW 75.08.080. 94-23-058 (Order 94-160), § 220-110-040, filed 11/14/94, effective 12/15/94; 87-15-086 (Order 87-48), § 220-110-040, filed 7/20/87. Statutory Authority: RCW 75.20.100 and 75.08.080. 83-09-019 (Order 83-25), § 220-110-040, filed 4/13/83.]