Search
173-806-010  <<  173-806-020 >>   173-806-030

WAC 173-806-020

No agency filings affecting this section since 2003

Purpose of this part and adoption by reference.

  This part contains the basic requirements that apply to the SEPA process. The city/county adopts the following sections of chapter 197-11 of the Washington Administrative Code by reference:


WAC
197-11-040 Definitions.
197-11-050 Lead agency.
197-11-060 Content of environmental review.
197-11-070 Limitations on actions during SEPA process.
197-11-080 Incomplete or unavailable information.
197-11-090 Supporting documents.
197-11-100 Information required of applicants.
197-11-158 GMA project review -- Reliance on existing plans, laws, and regulations.
197-11-210 SEPA/GMA integration. (WAC 197-11-210 through 197-11-235 optional; does not apply for non-GMA jurisdictions.)
197-11-220 SEPA/GMA definitions.
197-11-228 Overall SEPA/GMA integration procedures.
197-11-230 Timing of an integrated GMA/SEPA process.
197-11-232 SEPA/GMA integration procedures for preliminary planning, environmental analysis, and expanded scoping.
197-11-235 Documents.
197-11-238 Monitoring. (optional)
197-11-250 SEPA/Model Toxics Control Act integration.
197-11-253 SEPA lead agency for MTCA actions.
197-11-256 Preliminary evaluation.
197-11-259 Determination of nonsignificance for MTCA remedial actions.
197-11-262 Determination of significance and EIS for MTCA remedial actions.
197-11-265 Early scoping for MTCA remedial actions.
197-11-268 MTCA interim actions.




[Statutory Authority: RCW 43.21C.130. 98-23-038 (Order 95-16 Phase 2), § 173-806-020, filed 11/10/98, effective 12/11/98; 84-13-036 (Order DE 84-25), § 173-806-020, filed 6/15/84. Formerly WAC 173-805-020.]